| Bahia Beach Reef (bay) |
| Concrete Bridge Decking, Railings & Rubble From St. Pete Municpal Pier,load #1 |
| County: Hillsborough |
| Deployed: 8/29/2001 |
| Type: Bridge |
 |
 |
 |
| Bahia Beach Reef (bay) |
| Concrete Bridge Decking, Railings & Rubble From St. Pete Municpal Pier,load#2 |
| County: Hillsborough |
| Deployed: 11/2/2001 |
| Type: Bridge |
 |
 |
 |
| Egmont Key Reef (bay) |
| Concrete Bridge Decking, Railings & Rubble From Pinellas Bayway, Load 12 |
| County: Hillsborough |
| Deployed: 10/1/2001 |
| Type: Bridge |
 |
 |
 |
| Egmont Key Reef (bay) |
| Concrete Bridge Decking, Railings & Rubble From Pinellas Bayway, Load 11 |
| County: Hillsborough |
| Deployed: 9/26/2001 |
| Type: Bridge |
 |
 |
 |
| Egmont Key Reef (bay) |
| Concrete Bridge Decking, Railings & Rubble From Pinellas Bayway, Load 10 |
| County: Hillsborough |
| Deployed: 9/25/2001 |
| Type: Bridge |
 |
 |
 |
| Egmont Key Reef (bay) |
| Concrete Bridge Decking, Railings & Rubble From Pinellas Bayway, Load 9 |
| County: Hillsborough |
| Deployed: 9/19/2001 |
| Type: Bridge |
 |
 |
 |
| Egmont Key Reef (bay) |
| Concrete Bridge Decking, Railings & Rubble From Pinellas Bayway, Load 8 |
| County: Hillsborough |
| Deployed: 9/12/2001 |
| Type: Bridge |
 |
 |
 |
| Egmont Key Reef (bay) |
| Concrete Bridge Decking, Railings & Rubble From Pinellas Bayway, Load 7 |
| County: Hillsborough |
| Deployed: 9/6/2001 |
| Type: Bridge |
 |
 |
 |
| Egmont Key Reef (bay) |
| Concrete Bridge Decking, Railings & Rubble From Pinellas Bayway, Load 5 |
| County: Hillsborough |
| Deployed: 8/24/2001 |
| Type: Bridge |
 |
 |
 |
| Egmont Key Reef (bay) |
| Concrete Bridge Decking, Railings & Rubble From Pinellas Bayway, Load 4 |
| County: Hillsborough |
| Deployed: 8/20/2001 |
| Type: Bridge |
 |
 |
 |
| Egmont Key Reef (bay) |
| Concrete Bridge Decking, Railings & Rubble From Pinellas Bayway, Load 3 |
| County: Hillsborough |
| Deployed: 8/15/2001 |
| Type: Bridge |
 |
 |
 |
| Egmont Key Reef (bay) |
| Concrete Bridge Decking, Railings & Rubble From Pinellas Bayway, Load 2 |
| County: Hillsborough |
| Deployed: 8/9/2001 |
| Type: Bridge |
 |
 |
 |
| Egmont Key Reef (bay) |
| Concrete Bridge Decking, Railings & Rubble From Pinellas Bayway, Load 1 |
| County: Hillsborough |
| Deployed: 8/6/2001 |
| Type: Bridge |
 |
 |
 |
| Egmont Key Reef (bay) |
| Concrete Bridge Decking, Railings & Rubble From Pinellas Bayway, Load 6 |
| County: Hillsborough |
| Deployed: 8/30/2001 |
| Type: Bridge |
 |
 |
 |
| Egmont Key Reef (bay),#13 |
| Concrete Bridge Decking, Railings & Rubble From Pinellas Bayway, Load 25 |
| County: Hillsborough |
| Deployed: 12/21/2001 |
| Type: Bridge |
 |
 |
 |
| Egmont Key Reef (bay),#13 |
| Concrete Bridge Decking, Railings & Rubble From Pinellas Bayway, Load 24 |
| County: Hillsborough |
| Deployed: 12/7/2001 |
| Type: Bridge |
 |
 |
 |
| Egmont Key Reef (bay),#13 |
| Concrete Bridge Decking, Railings & Rubble From Pinellas Bayway, Load 23 |
| County: Hillsborough |
| Deployed: 12/4/2001 |
| Type: Bridge |
 |
 |
 |
| Egmont Key Reef (bay),#13 |
| Concrete Bridge Decking, Railings & Rubble From Pinellas Bayway, Load 22 |
| County: Hillsborough |
| Deployed: 11/27/2001 |
| Type: Bridge |
 |
 |
 |
| Egmont Key Reef (bay),#13 |
| Concrete Bridge Decking, Railings & Rubble From Pinellas Bayway, Load 14 |
| County: Hillsborough |
| Deployed: 10/8/2001 |
| Type: Bridge |
 |
 |
 |
| Egmont Key Reef (bay),#13 |
| Concrete Bridge Decking, Railings & Rubble From Pinellas Bayway, Load 16 |
| County: Hillsborough |
| Deployed: 10/16/2001 |
| Type: Bridge |
 |
 |
 |
| Egmont Key Reef (bay),#13 |
| Concrete Bridge Decking, Railings & Rubble From Pinellas Bayway, Load 13 |
| County: Hillsborough |
| Deployed: 10/4/2001 |
| Type: Bridge |
 |
 |
 |
| Egmont Key Reef (bay),#13 |
| Concrete Bridge Decking, Railings & Rubble From Pinellas Bayway, Load 15 |
| County: Hillsborough |
| Deployed: 10/12/2001 |
| Type: Bridge |
 |
 |
 |
| Port Manatee Reef (bay) |
| Concrete Bridge Decking, Railings & Rubble From Pinellas Bayway, Load 17 |
| County: Hillsborough |
| Deployed: 10/19/2001 |
| Type: Bridge |
 |
 |
 |
| Port Manatee Reef (bay) |
| Concrete Bridge Decking, Railings & Rubble From Pinellas Bayway, Load 18 |
| County: Hillsborough |
| Deployed: 10/25/2001 |
| Type: Bridge |
 |
 |
 |
| Port Manatee Reef (bay) |
| Concrete Bridge Decking, Railings & Rubble From Pinellas Bayway, Load 20 |
| County: Hillsborough |
| Deployed: 11/14/2001 |
| Type: Bridge |
 |
 |
 |
| Port Manatee Reef (bay) |
| Concrete Bridge Decking, Railings & Rubble From Pinellas Bayway, Load 21 |
| County: Hillsborough |
| Deployed: 11/26/2001 |
| Type: Bridge |
 |
 |
 |
| Port Manatee Reef (bay) |
| Concrete Bridge Decking, Railings & Rubble From Pinellas Bayway, Load 19 |
| County: Hillsborough |
| Deployed: 11/6/2001 |
| Type: Bridge |
 |
 |
 |
| Port Tampa Site (bay) |
| 4 Steel Barges, Bridge Rubble, Concrete Pilings |
| County: Hillsborough |
| Deployed: 3/21/1987 |
| Type: Barge |
 |
 |
 |
| Bahia Beach Reef (bay) |
| 463 Tons Of Concrete Forms-rubble And Stainless Steel Mixers. |
| County: Hillsborough |
| Deployed: 5/17/1989 |
| Type: Concrete Rubble |
 |
 |
 |
| Bahia Beach Reef(bay) |
| Concrete Rubble-concrete Slab-and Clay Water Pipes. |
| County: Hillsborough |
| Deployed: 6/29/1993 |
| Type: Concrete Rubble |
 |
 |
 |
| Ballast Point Pier (bay) |
| Modules Of Concrete Pilings, Slabs And Culverts Around Pier |
| County: Hillsborough |
| Deployed: 12/31/1987 |
| Type: Concrete Rubble |
 |
 |
 |
| Chamberlain High School (bay) |
| Annual Deployment On The Chamberlain High School Reef |
| County: Hillsborough |
| Deployed: 10/10/1996 |
| Type: Concrete Rubble |
 |
 |
 |
| Chief Reef (bay) |
| 50 Concrete Blocks, 500 Lbs., By Chamberlain H.s. |
| County: Hillsborough |
| Deployed: 9/11/1997 |
| Type: Concrete Rubble |
 |
 |
 |
| Egmont Key Reef |
| 350 Pieces Of Pipe And 22 Concrete Pyramids (6'h X 8'b) |
| County: Hillsborough |
| Deployed: 6/26/1999 |
| Type: Concrete Rubble |
 |
 |
 |
| Picnic Island Pier Reef (bay) |
| Concrete Pyramid Modules Placed 75' From The End Of The Picnic Pier. |
| County: Hillsborough |
| Deployed: 7/15/1991 |
| Type: Concrete Rubble |
 |
 |
 |
| Picnic Island Reef (bay) |
| 830 Cubic Yards Of Concrete And Misc. Fittings. |
| County: Hillsborough |
| Deployed: 5/28/1987 |
| Type: Concrete Rubble |
 |
 |
 |
| Port Manatee Reef (bay) |
| 450 Pounds Of Concrete Construction Blocks |
| County: Hillsborough |
| Deployed: 8/16/1997 |
| Type: Concrete Rubble |
 |
 |
 |
| Port Manatee Site (bay) |
| 632 Tons Of Concrete Culverts And Pipes. |
| County: Hillsborough |
| Deployed: 9/10/1991 |
| Type: Concrete Rubble |
 |
 |
 |
| Port Tampa Reef (bay) |
| Sixty Concrete Half Blocks, 7 Inches X 7 Inches X 7 Inches |
| County: Hillsborough |
| Deployed: 10/19/2000 |
| Type: Concrete Rubble |
 |
 |
 |
| Port Tampa Site (bay) |
| Annual Deployment On The Chamberlain High School Reef |
| County: Hillsborough |
| Deployed: 9/22/1999 |
| Type: Concrete Rubble |
|
 |
 |
| Bahia Beach Reef (bay) |
| 463 Tons Of Concrete Forms-rubble And Stainless Steel Mixers. |
| |
| Classification: Concrete Rubble |
| Material: Modules Concrete Pyramids |
| |
| County: Hillsborough |
| Deployed: 5/17/1989 |
| Depth: 20 |
| Relief: |
 |
| Coordinates |
 |
| Latitude: 27.44933 |
| Longitude: -82.30978 |
| View Chart |
|
|
 |
 |
|